Concept

Concept site by Apex Quantum. Voltway Electrical is not a real business. Every name, price and phone number below is invented. See the studio →

Voltway Electrical Concept by Que Paso

Domestic & commercial Manchester & east Cheshire

Electrical work that
passes first time.

Voltway is a two-van electrical contractor. Rewires, consumer unit upgrades, EICR reports, EV charge points and lighting design, tested to BS 7671 and certified before we pack the van.

Loop & RCD test VW-2511-093
Supply
239.4 V
Ze, external
0.21 Ω
PFC
1.14 kA
RCD at 1×
24 ms
Insulation
>299 MΩ
Polarity
Confirmed

Board tested 11 Nov, three-bed semi, Didsbury. Every reading written on the certificate, not just the pass.

  • StandardBS 7671:2018+A2:2022
  • Sign-offNotified to Building Control
  • No powerSame-day attendance
  • PricingFixed before we start
01

What we do

Five things, done properly, instead of twenty done quickly.

  • Full and partial rewires

    A rewire is disruptive, so we work it in zones and leave you with power and light in at least half the house every night. First fix, chased and capped, second fix, then two days of testing before anything is signed.

    3-bed semi 4 to 6 days from £3,900

  • Consumer unit upgrades

    Rewireable fuseboards and plastic enclosures come out. In goes a metal-clad board with an RCBO on every circuit, so a failed kettle element no longer takes the freezer and the landing light with it.

    10-way RCBO board one day from £720

  • EICR testing and reports

    A full periodic inspection, with every observation written in plain English next to its code. Landlord reports are back with you within 24 hours, and we will walk you through anything you do not recognise on the phone.

    Up to 10 circuits from £180

  • EV charge point installation

    7.4 kW untethered units with load curtailment on the incoming tails, run in armoured cable where it has to cross a drive. We look at the earthing arrangement before we price it, because a proper TT conversion costs less than a nuisance trip every wet morning.

    7.4 kW half a day from £899

  • Lighting design and control

    Layouts drawn before anyone drills a hole. Beam angles, colour temperature, dimming protocol and switch drops all agreed on paper, so the plasterer works to a plan and you are not living with nine downlights in a straight line.

    Per-room plan from £150

  • Not sure which of these you need?

    Most people ring us because something has tripped and will not reset. That is a fifteen-minute conversation, not a quote. Tell us what happened and what you have already tried.

    Ring the van 07700 900412 Mon to Fri, 7.30am to 5pm. Emergencies any time

    Start there instead →

02

Open the board

A 10-way board we fitted in Chorlton this October. Pick a way.

Almost nobody looks inside the one thing in the house standing between a fault and a fire. So here is a real board, way by way: what each circuit feeds, what protects it, the cable that runs it, and the readings we took before we handed over the certificate.

Tap a breaker, or walk the rail with the arrow keys.

  • What we look for first

    The cut-out fuse, the tails and the main bonding. If any of the three is wrong, nothing downstream is worth testing yet.

  • Why RCBOs, not one RCD

    A single RCD over half a board means one fault kills six circuits. An RCBO per way costs a little more and isolates the actual fault.

  • What you get afterwards

    A labelled board, an installation certificate and the full schedule of test results, so the next electrician starts from facts.

Way 1

Ring final, ground floor sockets

Device
32 A Type B RCBO, 30 mA Type A
Cable
2.5 mm² twin and earth, 1.5 mm² cpc
r1 + rn + r2
0.38 Ω, proved end to end
Zs measured
0.42 Ω max 1.37 Ω
Insulation
>299 MΩ at 500 V
RCD at 1×
24 ms pass

Why it matters Ring continuity gets proved properly, not buzzed out from one end. A ring with a broken leg tests perfectly healthy right up to the morning two kettles go on at once.

03

What an EICR actually tells you

Read the codes and you can read the report.

An inspection report is only worth having if you can understand it. Every observation gets one of four codes, and the codes are what decide whether your report says Satisfactory or Unsatisfactory. Here they are, in the order they should worry you.

The bit people get caught by

A single C1, C2 or FI makes the whole report Unsatisfactory. Any number of C3s does not. If somebody has handed you a failed report and a four-figure quote, ask them to point at the code on each observation. If they are all C3, nothing on that list has to be done.

C1

Danger present

Risk of injury, right now, to whoever is in the building.

What we do Make it safe before we leave the property, then tell you exactly what we did and what it still needs.

Typical A cracked socket front with an exposed live conductor behind it.

C2

Potentially dangerous

Not dangerous today, but it will be the first time something else goes wrong.

What we do Price the remedial work and explain the order to do it in. The report stays Unsatisfactory until it is cleared.

Typical No earthing to the metal light fittings on the upstairs circuit.

C3

Improvement recommended

Complied when it was installed, would be done differently today. Not a fault.

What we do Note it, cost it if you want it, and leave it alone if you do not. C3s do not fail a report.

Typical No RCD protection on a lighting circuit in an older installation.

FI

Further investigation

Something did not behave the way it should and we could not prove why on the day.

What we do Quote the time to open it up properly. Guessing at this point is how a small job becomes a big one.

Typical A circuit wired as a ring that will not prove continuity in either direction.

Report extract / observations Job VW-2510-128 / flat, Levenshulme
Sample observations from an inspection report, with code, location and finding
CodeLocationObservationOutcome
C2 Kitchen ring No RCD protection to sockets likely to supply equipment outdoors Cleared, RCBO fitted 18 Oct
C2 Consumer unit Loose neutral at the main terminal block, signs of heating Cleared same visit
C3 Hallway Lighting circuit has no RCD protection, compliant when installed Noted, no action taken
C3 Throughout Circuit labelling faded and partly incorrect Relabelled free of charge

Result on the day: Unsatisfactory on two C2s. Re-issued Satisfactory on 18 October once both were cleared, at the price quoted before the work started.

04

Lighting drawn before anything is drilled

One afternoon on paper saves the argument after the plasterboard.

Lighting plan for a kitchen and dining room A scaled plan of a kitchen and dining room. Eight downlights sit on a grid set off the walls, with their thirty-six degree beams drawn to scale. Two pendant drops hang over a central island, a warm white LED strip runs the length of the left wall, and switch drops are marked beside the door and at the dining end. The whole room is fed from way three of the consumer unit on one millimetre squared cable. WAY 3 · 1.0mm² · 6A RCBO WORKTOP ISLAND 1900 × 860 LED STRIP 2700K S2 S5 5940 3560
Kitchen and dining room, Heaton Moor. 5940 × 3560, drawn at 1:50 before first fix. Eight downlights, two pendants and a strip run, all on way 3.

A lighting plan costs an afternoon and saves the conversation that happens when the ceiling is already closed. We mark every luminaire, every switch drop and every driver location on a plan of your actual room, with the beam angles drawn to scale so you can see where the light lands.

  • Downlight, 36° beam. On a grid set off the walls by 600 mm, not centred on the ceiling.
  • Pendant drop. Centres at 480 mm, bottom of the shade 750 mm above the worktop.
  • LED strip, 2700 K. Driver in the cupboard above, not buried in the ceiling void.
  • Switch drops. Two gang at the door, five gang at the dining end, both trailing edge dimmable.

We will also tell you when you need fewer fittings. Sixteen downlights in a kitchen is a decision somebody made on a spacing calculator, not in the room.

05

Jobs we finished, awkward parts included

Six from the last two months.

Recent jobs, with reference, property, work carried out, time on site and what we found
Ref Property Work On site What came up
VW-2510-114 1930s semi, Chorlton Full rewire, 12-way RCBO board 6 days Junction box buried in the ceiling void feeding the whole first floor. Rerouted to an accessible position and tested.
VW-2510-128 Flat over a shop, Levenshulme EICR for letting 2 hours Two C2s. Both cleared within the week at the quoted price, report re-issued Satisfactory.
VW-2510-141 New-build driveway, Sale 7.4 kW charge point, 11 m SWA run 1 day Supply was TN-C-S but the bonding was 6 mm². Upgraded to 10 mm² before commissioning.
VW-2511-007 Block of 9 flats, Stockport Nine EICRs for a managing agent 2 days Seven Satisfactory, two Unsatisfactory on shared hallway lighting. Reports in the inbox the same evening.
VW-2511-022 Barber shop, Withington Commercial board change, out of hours 1 night Started at 7pm, tested and live again by 4am. No trading hours lost.
VW-2511-093 3-bed semi, Didsbury Board change, SPD, kitchen lighting 1 day Shower found on 6 mm² cable. Quoted the upgrade, did it the following week, nothing hidden in the invoice.
  • They turned up inside the window they gave, dust-sheeted the hall before touching anything, and the board is labelled so clearly I actually understand what everything does now.

    Priya N. / Didsbury / consumer unit upgrade

  • We had three quotes for the charger. Voltway was the only one who asked to see the cut-out and the earthing before putting a number on it. That told me everything I needed to know.

    Tom H. / Sale / EV charge point

  • Nine flats needed EICRs before the deadline. All nine inspected in two days and every report was in my inbox the same evening, which has never once happened before.

    Rachel D. / Stockport / managing agent

06

Two vans, eleven years, one standard

Small on purpose.

Voltway is Dan Okafor and Marcus Reilly. Dan served his time on commercial fit-out, Marcus on domestic rewires, and between them there is not much either has failed to see go wrong in somebody’s ceiling.

We stayed at two vans deliberately. The person who prices your job is the person who turns up to do it, and the person who tests it puts their own name on the certificate. There is no office, no call centre and nobody selling you a service plan on the way out.

Everything we install is designed and tested to BS 7671, the national standard for electrical installations, and anything notifiable under Part P goes to Building Control. You get the certificate and the full schedule of test results, not a sticker on the board and a verbal assurance.

  • Fixed price, written down

    You get a figure and a scope before we start. If we priced it wrong, that is our problem to absorb, not yours to discover on the invoice.

  • Tested before and after

    We take readings when we arrive and again before we leave, and you get both. If a number moved, we can tell you why.

  • We stop and tell you

    If opening something up changes the job, work stops and you get a phone call. No surprises added quietly at the end of the week.

  • We leave it clean

    Dust sheets down, floors back, holes made good. A rewire is messy while it happens and tidy when it finishes.

  • CoveringManchester, Stockport, Trafford, Tameside and east Cheshire. Roughly twenty miles of the M60.
  • HoursMonday to Friday, 7.30am to 5pm. Commercial work out of hours by arrangement.
  • EmergenciesNo power, a burning smell or a board that will not reset: ring any time, including weekends.
07

Tell us what is going on

A description beats a form every time, so write it how you would say it.

We answer every enquiry the same working day. Nothing is passed to anybody else.