Domestic & commercial / Manchester & east Cheshire
Electrical work that passes first time.
Voltway is a two-van electrical contractor. Rewires, consumer unit upgrades,
EICR reports, EV charge points and lighting design, tested to BS 7671 and
certified before we pack the van.
Board tested 11 Nov, three-bed semi, Didsbury. Every reading written on the certificate, not just the pass.
StandardBS 7671:2018+A2:2022
Sign-offNotified to Building Control
No powerSame-day attendance
PricingFixed before we start
01
What we do
Five things, done properly, instead of twenty done quickly.
S-01
Full and partial rewires
A rewire is disruptive, so we work it in zones and leave you with power and
light in at least half the house every night. First fix, chased and capped,
second fix, then two days of testing before anything is signed.
3-bed semi / 4 to 6 days / from £3,900
S-02
Consumer unit upgrades
Rewireable fuseboards and plastic enclosures come out. In goes a metal-clad
board with an RCBO on every circuit, so a failed kettle element no longer
takes the freezer and the landing light with it.
10-way RCBO board / one day / from £720
S-03
EICR testing and reports
A full periodic inspection, with every observation written in plain English
next to its code. Landlord reports are back with you within 24 hours, and we
will walk you through anything you do not recognise on the phone.
Up to 10 circuits / from £180
S-04
EV charge point installation
7.4 kW untethered units with load curtailment on the incoming tails, run in armoured
cable where it has to cross a drive. We look at the earthing arrangement before
we price it, because a proper TT conversion costs less than a nuisance trip
every wet morning.
7.4 kW / half a day / from £899
S-05
Lighting design and control
Layouts drawn before anyone drills a hole. Beam angles, colour temperature,
dimming protocol and switch drops all agreed on paper, so the plasterer works
to a plan and you are not living with nine downlights in a straight line.
Per-room plan / from £150
Not sure which of these you need?
Most people ring us because something has tripped and will not reset. That is
a fifteen-minute conversation, not a quote. Tell us what happened and what you
have already tried.
Ring the van07700 900412Mon to Fri, 7.30am to 5pm. Emergencies any time
A 10-way board we fitted in Chorlton this October. Pick a way.
Almost nobody looks inside the one thing in the house standing between a fault and
a fire. So here is a real board, way by way: what each circuit feeds, what protects
it, the cable that runs it, and the readings we took before we handed over the
certificate.
Tap a breaker, or walk the rail with the arrow keys.
VOLTWAY / 10-WAY METAL CLAD / IP30BS 7671:2018+A2:2022
MAIN100A
LineNeutralEarth
01
What we look for first
The cut-out fuse, the tails and the main bonding. If any of the three is wrong, nothing downstream is worth testing yet.
02
Why RCBOs, not one RCD
A single RCD over half a board means one fault kills six circuits. An RCBO per way costs a little more and isolates the actual fault.
03
What you get afterwards
A labelled board, an installation certificate and the full schedule of test results, so the next electrician starts from facts.
Way 1
Ring final, ground floor sockets
Device
32 A Type B RCBO, 30 mA Type A
Cable
2.5 mm² twin and earth, 1.5 mm² cpc
r1 + rn + r2
0.38 Ω, proved end to end
Zs measured
0.42 Ω max 1.37 Ω
Insulation
>299 MΩ at 500 V
RCD at 1×
24 ms pass
Why it matters
Ring continuity gets proved properly, not buzzed out from one end. A ring
with a broken leg tests perfectly healthy right up to the morning two
kettles go on at once.
Way 2
Ring final, first floor sockets
Device
32 A Type B RCBO, 30 mA Type A
Cable
2.5 mm² twin and earth, clipped in joists
r1 + rn + r2
0.44 Ω
Zs measured
0.51 Ω max 1.37 Ω
Points
11 twin sockets, 2 fused spurs
RCD at 1×
27 ms pass
Why it matters
A separate ring upstairs costs one extra way on the board and means a tripped
circuit never leaves the whole house dark at midnight. We split them
on every rewire, whether or not anyone asks.
Way 3
Lighting, ground floor
Device
6 A Type B RCBO, 30 mA Type A
Cable
1.0 mm² twin and earth
R1 + R2
0.52 Ω
Zs measured
0.74 Ω max 7.28 Ω
Connected load
14 points, 96 W total
Switch drops
6, all with cpc terminated
Why it matters
LED loads are tiny, but their drivers draw a hard inrush at switch-on. A
Type B holds it. Fitting a Type C here to stop nuisance tripping would also
hide a genuine fault, so we fix the cause instead.
Way 4
Lighting, first floor and loft
Device
6 A Type B RCBO, 30 mA Type A
Cable
1.0 mm² twin and earth, loft runs on trays
R1 + R2
0.61 Ω
Zs measured
0.83 Ω max 7.28 Ω
Connected load
11 points, 1 loft socket for the aerial amp
Insulation
>299 MΩ at 500 V
Why it matters
Loft cable sitting under 300 mm of insulation cannot shed heat, so it has to
be derated or clipped above the quilt. This one runs on trays. It is the
single most common thing we find done wrong after a loft top-up.
Way 5
Electric shower, 8.5 kW
Device
40 A Type B RCBO, 30 mA Type A
Design current
36.9 A at 230 V
Cable
10 mm² twin and earth, clipped direct
Isolation
45 A DP pull cord outside zone 1
Zs measured
0.29 Ω max 1.09 Ω
Bonding
Supplementary bonding not required, all circuits RCD protected
Why it matters
Showers are the thing we most often find on an undersized cable. At this run
length 10 mm² is not a preference, it is the only size that holds the
volt drop and the fault current. We will not fit one on 6 mm².
Way 6
Cooker and hob
Device
32 A Type B RCBO, 30 mA Type A
Nameplate
10.2 kW combined
After diversity
28.4 A assumed demand
Cable
6 mm² twin and earth to a 45 A cooker switch
Connection
Outlet plate 400 mm to the side, not above
Zs measured
0.37 Ω max 1.37 Ω
Why it matters
Rated on diversity rather than nameplate, because nobody runs both ovens,
every ring and the grill simultaneously. Size it on the full 10.2 kW and you
are paying for 10 mm² cable you will never use.
Way 7
EV charge point, 7.4 kW
Device
32 A Type B RCBO
RCD arrangement
30 mA Type A plus 6 mA DC detection inside the unit
Cable
6 mm² SWA, 11 m, 600 mm deep under the drive with tile
PEN protection
Integral to the charge point, tested on commissioning
Load curtailment
CT clamp on the incoming tails, limit set to 60 A
Zs measured
0.46 Ω max 1.37 Ω
Why it matters
Open PEN protection is the whole argument on an EV install. Either the unit
handles it in hardware, or the installation goes to a TT earth with its own
rod and a tested resistance. There is no third option and we do not guess.
Way 8
Garage and garden supply
Device
16 A Type B RCBO, 30 mA Type A
Cable
2.5 mm² SWA, gland and banjo at both ends
Sub-board
2-way: 6 A lighting, 16 A socket
Outside sockets
2 × IP66, RCD protected locally as well
Zs measured
0.88 Ω max 2.73 Ω
Earthing
Exported from the main earthing terminal
Why it matters
Its own small board in the garage means a strimmer through a flex trips one
16 A way in an outbuilding, not the sockets in the kitchen. It also gives you
a local isolator for when you are working out there.
Way 9
Surge protection device
Device
Type 2 SPD, 1+1 configuration
Protection level Up
1.5 kV
Connection
Spurred from a 16 A MCB, leads kept under 500 mm
Status
Green window, serviceable ok
Checked
Visually, at every periodic inspection
Replaceable
Cartridge only, board stays in place
Why it matters
Not every installation needs one, and we will tell you if yours does not. But
one switching surge through a heat pump controller costs considerably more
than the device, and the lead length matters more than the brand.
Origin
Main switch and incoming supply
Device
100 A double pole main switch, lockable off
Earthing system
TN-C-S (PME)
Tails
25 mm² line and neutral, 16 mm² earthing conductor
Ze, external
0.21 Ω
PFC
1.14 kA, board rated 10 kA conditional
Main bonding
10 mm² to water and gas, both within 600 mm of entry
Why it matters
The first thing we look at on any job. If the tails are undersized, the
bonding is missing or the cut-out has no fuse carrier, we stop and talk to the
network operator before another minute of work gets done.
03
What an EICR actually tells you
Read the codes and you can read the report.
An inspection report is only worth having if you can understand it. Every
observation gets one of four codes, and the codes are what decide whether your
report says Satisfactory or Unsatisfactory. Here they are, in the order they should
worry you.
The bit people get caught by
A single C1, C2 or FI makes the whole report Unsatisfactory. Any number of C3s
does not. If somebody has handed you a failed report and a four-figure quote, ask
them to point at the code on each observation. If they are all C3, nothing on
that list has to be done.
C1
Danger present
Risk of injury, right now, to whoever is in the building.
What we do Make it safe before we leave the property, then tell you exactly what we did and what it still needs.
Typical A cracked socket front with an exposed live conductor behind it.
C2
Potentially dangerous
Not dangerous today, but it will be the first time something else goes wrong.
What we do Price the remedial work and explain the order to do it in. The report stays Unsatisfactory until it is cleared.
Typical No earthing to the metal light fittings on the upstairs circuit.
C3
Improvement recommended
Complied when it was installed, would be done differently today. Not a fault.
What we do Note it, cost it if you want it, and leave it alone if you do not. C3s do not fail a report.
Typical No RCD protection on a lighting circuit in an older installation.
FI
Further investigation
Something did not behave the way it should and we could not prove why on the day.
What we do Quote the time to open it up properly. Guessing at this point is how a small job becomes a big one.
Typical A circuit wired as a ring that will not prove continuity in either direction.
Sample observations from an inspection report, with code, location and finding
Code
Location
Observation
Outcome
C2
Kitchen ring
No RCD protection to sockets likely to supply equipment outdoors
Cleared, RCBO fitted 18 Oct
C2
Consumer unit
Loose neutral at the main terminal block, signs of heating
Cleared same visit
C3
Hallway
Lighting circuit has no RCD protection, compliant when installed
Noted, no action taken
C3
Throughout
Circuit labelling faded and partly incorrect
Relabelled free of charge
Result on the day: Unsatisfactory on two C2s. Re-issued Satisfactory on 18 October
once both were cleared, at the price quoted before the work started.
04
Lighting drawn before anything is drilled
One afternoon on paper saves the argument after the plasterboard.
Kitchen and dining room, Heaton Moor. 5940 × 3560, drawn at 1:50
before first fix. Eight downlights, two pendants and a strip run,
all on way 3.
A lighting plan costs an afternoon and saves the conversation that happens when
the ceiling is already closed. We mark every luminaire, every switch drop and
every driver location on a plan of your actual room, with the beam angles drawn
to scale so you can see where the light lands.
Downlight, 36° beam. On a grid set off the walls by 600 mm, not centred on the ceiling.
Pendant drop. Centres at 480 mm, bottom of the shade 750 mm above the worktop.
LED strip, 2700 K. Driver in the cupboard above, not buried in the ceiling void.
Switch drops. Two gang at the door, five gang at the dining end, both trailing edge dimmable.
We will also tell you when you need fewer fittings. Sixteen downlights in a
kitchen is a decision somebody made on a spacing calculator, not in the room.
05
Jobs we finished, awkward parts included
Six from the last two months.
Recent jobs, with reference, property, work carried out, time on site and what we found
Ref
Property
Work
On site
What came up
VW-2510-114
1930s semi, Chorlton
Full rewire, 12-way RCBO board
6 days
Junction box buried in the ceiling void feeding the whole first floor. Rerouted to an accessible position and tested.
VW-2510-128
Flat over a shop, Levenshulme
EICR for letting
2 hours
Two C2s. Both cleared within the week at the quoted price, report re-issued Satisfactory.
VW-2510-141
New-build driveway, Sale
7.4 kW charge point, 11 m SWA run
1 day
Supply was TN-C-S but the bonding was 6 mm². Upgraded to 10 mm² before commissioning.
VW-2511-007
Block of 9 flats, Stockport
Nine EICRs for a managing agent
2 days
Seven Satisfactory, two Unsatisfactory on shared hallway lighting. Reports in the inbox the same evening.
VW-2511-022
Barber shop, Withington
Commercial board change, out of hours
1 night
Started at 7pm, tested and live again by 4am. No trading hours lost.
VW-2511-093
3-bed semi, Didsbury
Board change, SPD, kitchen lighting
1 day
Shower found on 6 mm² cable. Quoted the upgrade, did it the following week, nothing hidden in the invoice.
They turned up inside the window they gave, dust-sheeted the hall before
touching anything, and the board is labelled so clearly I actually understand
what everything does now.
Priya N. / Didsbury / consumer unit upgrade
We had three quotes for the charger. Voltway was the only one who asked to
see the cut-out and the earthing before putting a number on it. That told me
everything I needed to know.
Tom H. / Sale / EV charge point
Nine flats needed EICRs before the deadline. All nine inspected in two days
and every report was in my inbox the same evening, which has never once
happened before.
Rachel D. / Stockport / managing agent
06
Two vans, eleven years, one standard
Small on purpose.
Voltway is Dan Okafor and Marcus Reilly. Dan served his time on commercial
fit-out, Marcus on domestic rewires, and between them there is not much either
has failed to see go wrong in somebody’s ceiling.
We stayed at two vans deliberately. The person who prices your job is the person
who turns up to do it, and the person who tests it puts their own name on the
certificate. There is no office, no call centre and nobody selling you a service
plan on the way out.
Everything we install is designed and tested to BS 7671, the national
standard for electrical installations, and anything notifiable under Part P goes
to Building Control. You get the certificate and the full schedule of test
results, not a sticker on the board and a verbal assurance.
01
Fixed price, written down
You get a figure and a scope before we start. If we priced it wrong, that is our problem to absorb, not yours to discover on the invoice.
02
Tested before and after
We take readings when we arrive and again before we leave, and you get both. If a number moved, we can tell you why.
03
We stop and tell you
If opening something up changes the job, work stops and you get a phone call. No surprises added quietly at the end of the week.
04
We leave it clean
Dust sheets down, floors back, holes made good. A rewire is messy while it happens and tidy when it finishes.
CoveringManchester, Stockport, Trafford, Tameside and east Cheshire. Roughly twenty miles of the M60.
HoursMonday to Friday, 7.30am to 5pm. Commercial work out of hours by arrangement.
EmergenciesNo power, a burning smell or a board that will not reset: ring any time, including weekends.
07
Tell us what is going on
A description beats a form every time, so write it how you would say it.