Concept site by Apex Quantum. Ridgeline Roofing is not a real business. See who built it

Ridgeline Roofing

Est. 1996 · Wakefield · West Yorkshire

A roof is only
as good as
what sits
underneath it

Anyone can hang tiles on a bad batten. We strip the lot, check every rafter foot, put the membrane and the battens in the right order, and hand you a written guarantee before the scaffold comes down.

Book a roof survey See the build-up

On the tools since
1996
Written guarantee
20 yrs
Storm callout
24 hrs
A row of pitched stone terraces with shared chimney stacks at night in the rain. A scaffold on sole boards and base plates stands against the middle house, whose slope has been stripped back to new battens over a grey breather membrane, with three courses of slate still on at the eaves and a banded stack of tiles waiting on the boarded lift behind the toe board. A ladder runs up the end bay from the street, where a skip of broken slate stands outside the house and a Ridgeline van is parked along the terrace. RIDGELINE RIDGELINE
Wakefield, day three. Battens on, tiles tomorrow.

01 · What we do

Five jobs. Done in the right order, every time.

We do not fit windows, we do not lay drives and we do not do a bit of plastering on the side. Roofs, the things that hold them up and the things that take the water away. That is the whole list.

  • Full re-roofs

    Strip to the rafters, replace what has rotted, new membrane, new treated battens and your choice of tile or Welsh slate. Scaffold, skips and tip fees are in the price.

  • Flat roofs

    Single-ply membrane or three-layer torch-on felt over new insulation, with the falls set properly so water leaves the roof instead of sitting on it. Garages, extensions, dormers.

  • Chimneys and leadwork

    Re-pointing, re-building from the flaunching down, new flashings bossed and dressed on site in code 4 lead. No cement fillets, no flashing tape, no mastic holiday repairs.

  • Gutters, fascias and soffits

    Deep-flow gutter on brackets at 800 centres, not screwed through the back of the fascia and hoped for. We clear, re-fall, replace, and tell you which it needs.

  • Storm damage and leaks

    Make safe, sheet it, then find the actual cause rather than the wet patch. We write the lot up with notes you can hand straight to an insurer.

02 · How we build it up

The eight layers most people never see

A roof that leaks after four years usually leaks because of something that cost eleven pounds and took ten minutes. So here is the whole section, eaves to ridge, drawn the way it goes on. Pick a layer to pull it out of the drawing.

Cross-section drawing of a pitched roof build-up, gutter to ridge A measured section through a thirty-two degree pitched roof. From the inside out it shows the rafters with insulation between them, a breather membrane, counter-battens running up the slope, tile battens across it, and a double lap of tiles. At the eaves the drawing shows the wall, the wallplate notched under the rafter, the soffit, the over-fascia vent, the fascia board and a half-round gutter. At the apex it shows a mechanically fixed dry ridge with the opposite slope running away. Each numbered marker on the drawing matches the numbered list underneath it.

Drag the drawing sideways to read the notes. Showing the whole section, eaves to ridge.

The build-up, layer by layer

  • Double lapped, with the lap set for the pitch rather than for the tile count. Concrete interlockers, clay plain tiles or reclaimed Welsh slate, all nailed or clipped to the standard, not laid loose.

  • Graded, treated, 25 by 50 minimum, nailed to every rafter it crosses and gauged off the eaves so the last course lands clean at the ridge. The cheap bit everybody cheats on.

  • Run up the slope, under the tile battens. Anything that gets past the tiles lands on the membrane and runs down a clear channel into the gutter instead of pooling against timber.

  • Lapped the right way round, supported, and dressed into the gutter with an eaves carrier so wind-driven rain has somewhere to go. Never stretched drum-tight across the rafters.

  • Every rafter foot and wallplate gets looked at with the covering off. Soft timber is cut out and spliced, not boxed in. Insulation goes back to current standards with the airway kept clear.

  • An over-fascia vent and a continuous 25mm airway. Without it you get a warm, damp roof void, black mould on the plasterboard and a phone call to us in February.

  • Fascia on sound rafter ends, soffit ventilated, deep-flow gutter on brackets at 800 centres with the fall set towards the outlet. Checked with a hose before we leave.

  • Dry ridge, mechanically fixed, so it cannot be lifted off by a gale the way a mortar ridge can. Chimneys and abutments get code 4 lead, bossed on site and wedged into raked joints.

We work to BS 5534 for slating and tiling and BS 6229 for flat roofs, and the build-up above is what that actually looks like on a house. Ask us to walk you through it on your own roof and we will.

03 · Prices

What people actually pay

Nobody can price a roof from a postcode, so these are the bands our last two years of work fell into. Your survey gives you a fixed figure, broken down, on one page.

  • Two-bed terrace, full re-roof

    £6,400 – £8,200

    Concrete interlocking tile. Strip, new membrane and battens, dry ridge and verge, new gutter. Around five working days.

  • Three-bed semi, natural slate

    £11,500 – £15,000

    Reclaimed or new Welsh slate, lead valleys and chimney flashings re-made. Eight to eleven working days depending on the timber we find.

  • Garage or extension
    flat roof

    £2,200 – £3,400

    Up to 20 square metres. New firrings to set the fall, insulation, single-ply membrane, new trims and outlet. Usually two days.

  • Chimney re-point and re-flash

    £750 – £1,400

    Raked out and re-pointed, new flaunching, code 4 lead apron and side flashings. Price depends on access and whether scaffold is needed.

  • Storm make-safe and report

    from £180

    Out the same day, sheeted and made watertight, with written notes and measurements for your insurer. Deducted from the repair if you use us.

  • What moves the number

    • Rotten rafter feet or a failed wallplate
    • Scaffold over a pavement or a neighbour’s garden
    • Valleys, dormers and more than one chimney
    • Conservation areas and like-for-like slate

Figures include scaffold, skips and tip fees. VAT is shown separately on every quote. We do not ask for a deposit before the scaffold goes up.

04 · Recent work

Straight out of the job diary

No stock photographs of somebody else’s roof. Just what the job was, what we found once the covering came off, and how long it took.

  1. Horbury · 1890s stone terrace

    Full re-roof, reclaimed Welsh slate

    Two rafter feet had gone soft under an old valley that had been patched with mortar. Cut back to sound timber, spliced in new ends, new wallplate across three metres. Nine working days.

  2. Ossett · 1970s semi

    Garage roof, single-ply membrane

    The old felt had no fall at all and a bird bath had formed over the door. New firrings, 100mm insulation, new outlet through the parapet. Two days, done in the rain.

  3. Sandal · detached, 1930s

    Storm callout, then chimney re-build

    Three ridge tiles off in an overnight gale. Sheeted by 8am, and the stack turned out to be loose from the flaunching down. Re-built in salvaged brick to match, new lead apron.

  4. Outwood · new-build estate, 2016

    Leak traced, no re-roof needed

    Two previous firms had quoted a full strip. The water was coming in at a dry verge unit that had never been clipped. Fixed in under an hour, charged the callout, said so.

  5. Normanton · end terrace

    Re-roof with insulation upgrade

    Rafter depth was never going to take the insulation the owner wanted, so we built over the rafters instead of pretending. Explained the extra on day one, not on the invoice. Eleven days.

Years on West Yorkshire roofs
30
Roofs stripped and re-laid
1,400
Average storm callout
4 hrs
Guarantee on a full re-roof
20 yrs
  • “They turned up on the day they said, in the weather they said they would work in. The lad walked me up the scaffold and showed me the rotten batten before he binned it.”

    Dawn H. · Horbury

  • “Two other firms wanted eleven grand for a new roof. Ridgeline found a verge clip, charged me the callout and told me the roof had fifteen years left in it.”

    Imran S. · Outwood

  • “Storm took the ridge off at two in the morning. Sheeted before I left for work, full written report for the insurers by the Friday. Not one argument about it.”

    Gail & Peter M. · Sandal

05 · The firm

Two gangs, five people, all on our own books

Mark Ridgway started on his own with a ladder rack and a Nokia in 1996. His daughter Jo runs the surveys and the pricing now, and between them they have turned down more work than they have taken, because a gang that is stretched leaves a roof half done when the weather turns.

There is no sales team, nobody on commission and nobody knocking on doors after a storm. The person who prices your roof is the person who will be stood on it, and the number they give you is the number on the invoice.

  • Work to BS 5534 and BS 6229, and we will show you the clause
  • Scaffold by a CISRS-carded scaffolding firm, never ladders for a strip
  • Fully insured, with the certificate emailed before we start
  • No deposit before the scaffold is up
  • Written guarantee, transferable if you sell the house
  • We tell you when you do not need a new roof

06 · Get us out

Book a survey, or
just ask us what
you are looking at

Send a line about what is happening and we will tell you straight whether it is a repair, a re-roof or nothing at all. If water is coming in right now, ring the storm line instead of typing.

Where we work: Wakefield, Horbury, Ossett, Normanton, Outwood, Sandal, Crigglestone, Pontefract, Castleford, Dewsbury, Mirfield and south Leeds. Further out for a full re-roof, and we will say so before you ask.

Ask us about your roof

Concept form. It does not send anywhere and nothing is stored.

On the real build: we reply to everything within one working day. No mailing list, no follow-up calls from anybody who is not a roofer.